Please activate JavaScript!
Please install Adobe Flash Player, click here for download

Elco References E

Energy efficiency project for the RWE Regional Centre, Münster New heating system reduces CO2 emission by 600 tonnes! The old electrode warm-water boiler at the RWE Regional Centre, Münster, had seen better days. It was no longer technically up to date, and with its large buffer storage tanks, it took up too much space. An overhaul of the heating system was therefore the obvious course. ELCO’s solution: two cascaded RENDAMAX 3602 gas condenser boilers. The result is a reduction of the CO2 emission by 600 tonnes a year! A further benefit: the new double-boiler system takes up only 80 m² of floor space, instead of 600 m². An ideal solution was also found for the financing. The heating contractor, RWE Energiedienstleis- tungen GmbH (ED), finances and operates the system and undertakes the maintenance and repair. Bottom line: the customer RWE has no investment costs, does not have to take risks, and receives the latest technology plus reliable service. Customer RWE Regional Centre Münster Executive specialist partner RWE Energiedienstleistungen GmbH (ED) Dortmund Efficiency • Tapping of potential for energy-saving through heating-system contracting • Reduction of the CO2 emission by 600 tonnes • Quick amortisation through energy savings and reduced operating costs Convenience • Compact construction, small space requirement BENEFITS • Extremely low emission levels and quiet operation • Flexible adjustment of power through wide modulation ranges Reliability • One hundred percent operational reliability through cascaded system • Maintenance, repair and procurement of replacement parts by the contractor • No investment risk