Please activate JavaScript!
Please install Adobe Flash Player, click here for download

Elco References E

New building: Huaneng Plaza, Peking A project of huge dimensions: ELCO provides 40,000 liter warm water every day The Huaneng Plaza is the company headquarters of the Chinese Huaneng Group. The corporate group is the largest electricity producer in China and employs some 1,500 staff, with numbers rising. The provision of warm water for a building of these dimensions presented a special challenge for any kind of heating system. ELCO had the right solution ready on hand – a state-of-the-art and highly efficient solar plant for water heating. A total of 126 AURON 20 DF collectors are located on the roof of the building. The four water storage tanks, the water pump and the associated com- ponents are housed in the machine room on the 10th storey. Heat is constantly generated by means of electromagnetic induction, the daily capacity for water heating is 40,000 liter. The use of the sustainable product series from ELCO in the Customer China Huaneng Group, No. 23 of Jia, Fuixin Road, Haidian district, Beijing, 100088, PR China Planning East China Architectural Design & Research Institute Co., Ltd., No. 246 Middle JiangXi Road, Shanghai 200002, PR China Installation Liangji Tianhui Refrigeration Technology Co., Ltd. Room 906, B zuo,16th floor, Block 1 of Fang Chengyuan, Fang Zhuang, Fengtai District Beijing 100078, PR China Huaneng office building is not least proof of the company‘s commitment to energy-saving measures and environmental protection. BENEFITS Efficiency • Maximum use of solar energy thanks to the ultra-modern row solution • Integrated boiler always ensures the right temperature • Intelligent series connection works highly energy-efficiently Convenience • Constant water temperature of 50°C all day • Warm water is immediately available • Heat preserving system adapts in line with the water demand • Hygienic and safe: antibacterial equipment against legionella bacteria • Multi-stage protective mechanism against overheating, freezing and pressure overload Savings • Generally: lower running costs, since heat storage tanks are used • Total energy saving 530,000 kWh • Reduction of CO2 emissions by 55 % (149 tonnes)